Once the DPLC capabilities requirements are confirmed and the sales process is completed;
Step 1. A site survey is done to determine the delivery method and how connectivity will be delivered into the customer’s premise.
Step 2. Proceeding the survey is completed, the proposal document is then provided to sign off.
Step 3. After this is agreed upon, the installation and integration of the equipment is scheduled.
The timeframe for installation and integration is usually between 3-5 days.
Should you require further assistance, please liaise with your sales representative, Corporate Care at +1 (284) 300-4357 from any device or a Digicel representative